Project: Kidston
Client: Genex Power / JOHN HOLLAND McCONNELL DOWELL
Main Contractor: Andritz Hydro
Country: Australia
Duration: 2021-2026

Project details:

New Pump Storage Plant with two units 2x149MVA, including Upper Basin, Lower Basin. Installation of two Units, Powerhouse and outdoor electro-mechanical equipment. Common system listed as Batteries, Chargers, UPS, Motor Control Centers, Main DC and AC Switchboards, Drainage & Dewatering system, Compressed Air System, Fire Fighting System, Fire Detection system, Diesel Generators as well as for Unit related equipment for Motor Control Centers, 16.5kV Switchgears, Insulated Phase Bus Duct system, Step up Transformers and Static Frequency Converter.

Our scope:

  • Commissioning protocols preparation
  • Factory Acceptance tests of all LV AC and DC, MV Cubicles
  • Commissioning of all Electrical equipment
  • Commissioning Coordination activities for Units and common systems
  • Review of Electrical design
  • Making of As Built drawings