Hatta
Project: Hatta
Client: DEWA
Main Contractor: Andritz Hydro
Country: United Arab Emirates
Duration: 2022-2025
Project details:
New Pump Storage Plant with two units 2x188MVA, including Upper Basin, and Powerhouse common equipment. Installation of two Units, Powerhouse and outdoor electro-mechanical equipment including 132kV GIS. Common system listed as Batteries, Chargers, UPS, Motor Control Centers, Main DC and AC Switchboards, Drainage & Dewatering system, Compressed Air System, Fire Fighting System, Fire Detection system, Diesel Generators as well as for Unit related equipment for Motor Control Centers, 15.5kV Switchgears, Insulated Phase Bus Duct system, Step up Transformers, Static Frequency Converter and 132kV GIS equipment.
Our scope:
- Installation coordination for GIS Equipment
- Commissioning protocols preparation
- Factory Accepetance tests of all LV AC and DC, MV Cubicles
- Commissioning of all Electrical equipment
- Review of Electrical design
- Making of As Built drawings